Bank Of Baku

Construction of Ahmadbeyli–Horadiz–Minjivan–Aghband highway to finish by spring 2026

Construction of Ahmadbeyli–Horadiz–Minjivan–Aghband highway to finish by spring 2026
# 05 September 2025 18:19 (UTC +04:00)

The work on the Ahmadbeyli-Horadiz-Minjivan-Aghband highway will be completed in the spring of 2026, Ilham Suleymanov, Deputy Head of the Investment Department at the State Agency for Automobile Roads, told journalists, APA-Economics correspondent dispatched to Zangilan district reports.

According to him, the total length of the Ahmadbeyli-Horadiz-Minjivan-Aghband highway is 123.6 kilometers, and this road was designed in accordance with the first technical grade: "The width of the traffic section varies between 14-21 meters. The 78-kilometer section of the road was built with 6 lanes, and the remaining 45.6-kilometer section with 4 lanes. 28 bridges have been built on the road. Currently, the physical progress of the work on the highway is 95%."

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED