Bank Of Baku

First gas production from ACG free gas project expected this summer

First gas production from ACG free gas project expected this summer
# 06 March 2026 17:34 (UTC +04:00)

The first production of “blue fuel” under the free gas development project at the Azeri-Chirag-Gunashli (ACG) block of fields is expected to begin in the summer months, said Giovanni Cristofoli, BP’s regional president for Azerbaijan, Georgia, and Türkiye (AGT), during a meeting with media representatives specializing in the oil and gas sector, APA-Economics reports.

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED