"A new 35-kilovolt power line is being laid from Gulebird s / s to Lachin's Minkend village through the Lachin corridor, Vagif Mustafayev, spokesman for Azerishig OJSC, told APA-Economics.
According to him, the work conducted in this direction is about to be completed.
"Azerishig is laying a new 35-kilovolt line from the Gulabird s / s to the Minkend village of Lachin. The power line passes through the Lachin corridor. Currently, the work in this direction is about to be completed. 75% of the work has already been done," Mustafayev added.