Bank Of Baku

Traffic in Badamdar-Gurd gapisi-Khojasen road to be limited

Traffic in Badamdar-Gurd gapisi-Khojasen road to be limited
# 13 April 2007 16:25 (UTC +04:00)
Traffic in Badamdar-Gurd gapisi-Khojasen road will be limited on April 16, Azeryolservis OJSC told the APA. Limiting of the traffic in this direction is connected with the construction of the Baku Bypass-1 highway.
Azeryolservis advises the drivers to use Lokbatan-Khojasen highway. /APA/
1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED