Nakhchivan part of International Silk Way undergoes reconstruction

Nakhchivan part of International Silk Way undergoes reconstruction
# 12 November 2008 09:41 (UTC +04:00)
Nakhchivan. Gurbanoglu-APA. Nakhchivan part of International Silk Way is under reconstruction, APA local bureau reports.
21 km part of Nakhchivcan-Sadarak magistral from Kangarli to Khok village has been reconstructed.
Width of way reached 21 meter and in total 88 km territory of magistral will be constructed and lighting poles will be installed. The magistral can cover four cars at the same time.
After construction of way from Umid Bridge to Nakhchivan, the way from Sadarak-Igdir check point till Julfa check point will be widen and the measures will be concluded late in 2009.
#
#

THE OPERATION IS BEING PERFORMED