By the end of 2024, a total of AZN 5,347.2 million were spent from the state budget for the reconstruction and restoration of the liberated territories, this was reflected in the Cabinet of Ministers' report for 2024, APA reports.
It was noted that a total of 17.6 billion AZN were allocated for this purpose from the state budget between 2021 and 2024, and 4 billion AZN are planned to be allocated in the 2025 state budget.