The Shimal-2 combined-cycle power plant has generated 21.1 billion kWh of electricity since it was commissioned through September of this year, the Ministry of Energy said, APA-Economics reports.
Seven years ago, on September 5, 2019, the Shimal-2 Power Plant, located in Baku, was commissioned. The plant has an installed capacity of 400 MW.