Of the seven trains delivered to Baku, assembly, configuration, and testing of five have been completed, with the remaining two scheduled to enter service by November 8, this was stated while President of the Republic of Azerbaijan Ilham Aliyev inspected the new-generation metro trains assembled by Baku Metro CJSC in Baku, APA reports.
With the addition of these new trains, the total number of the latest-generation carriages in the Baku Metro fleet has now reached 150.