Bank Of Baku

A problem with traffics of trains in Metropolitan

A problem with traffics of trains in Metropolitan
# 06 March 2010 11:03 (UTC +04:00)
Baku. Rashad Suleymanov – APA-Economics. In Neftchiler – Hazi Aslanov stations was established a new system of speed regulation, In this connection the metyro trains were delayed for 8 minutes, Elbrus Muradov, head engineer of Metropolitan told to APA.

According to E. Muradov the system was established today and regulate the traffic of trains, in metro.
1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED