Bank Of Baku

Blue Water signs contract with Baku Shipyard

Blue Water signs contract with Baku Shipyard
# 06 May 2015 07:32 (UTC +04:00)

The two sections will form the hull of a state of the art SCV (Subsea Construction Vessel) named "Khankendi". Once completed, "Khankendi" will be deployed for the stage 2 development of the Shah Deniz field, which lies some 70 kilometres offshore in the Azerbaijan sector of the Caspian Sea.

 

Each hull section has a length of 140 metres, a width of 16 metres and a height of 17 metres. The weight per section is 5,400 metric tons.

 

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED