Bank Of Baku

Construction of Shukurbayli-Jabrayil-Hadrut highway being concluded in Azerbaijan-PHOTO-VIDEO

Construction of Shukurbayli-Jabrayil-Hadrut highway being concluded in Azerbaijan-PHOTO -VIDEO
# 13 October 2023 12:22 (UTC +04:00)

The construction works of the Shukurbayli-Jabrayil-Hadrut highway, which is one of the road infrastructure projects implemented in the territory of Garabagh and Eastern Zangazur economic regions of Azerbaijan by the instructions of the head of state, is concluded by continuing rapidly, APA-Economics reports.

The length of the road, which takes its start at the part of Hajigabul-Horadiz-Aghband-Zangazur corridor highway that passes through the Shukurbayli village of Jabrayil and extends to the Hadrut settlement of Khojavand district, is 39.7 km.

The highway is being constructed according to technical grade I with 4 traffic lanes. The road section is 14 meters, and the width of the soil bed is 21.5 meters.

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED