Bank Of Baku

SOCAR reduces oil transportation via BTC pipeline 7%

SOCAR reduces oil transportation via BTC pipeline 7%
# 04 February 2016 13:21 (UTC +04:00)

Baku. Agshin Rafigoglu - APA-Economics. Baku-Tbilisi-Ceyhan (BTC) pipeline transported 2,288,590 tonnes of Azerbaijani oil in January 2016, down 7.37% from previous year.

 

Totally, 294,963,979 tonnes of oil have been pumped in the pipeline since it was launched.

 

Moreover, the pipeline transported 358,533 tonnes of Turkmen and Kazakh oil in the reporting period, down 40.45% by contrast to 2015.

 

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED