Baku. Agshin Rafigoglu - APA-Economics. SOCAR's "Azneft" Production Union carried out 1,489 current repairs and 88 capital repairs in September 2015. 55 wells were put into operation from capital repairs. The wells put into operation in September produced 53,283 tonnes of oil and 15,842,000,000 cubic meters of gas, as well as the wells in the inactive funds produced 3,871 tonnes of oil and 6,902,000,000 cubic meters of gas.
“28 May” Oil Gas Extraction Department repaired 10 wells, put into operation 4 wells. The wells put into operation in September produced 29,999 tonnes of oil and 15,842,000,000 cubic meters of gas and 1,131 tonnes of condensate.
“Neft Dashlari” Oil-Gas Extraction Department carried out capital repairs in 18 wells, current repairs in 15 wells. The wells put into operation in September produced 15,995 tonnes of oil.
Oil and Gas Extraction Department (OGED) named after Nariman Narimanov carried out capital repairs in one well and this well produced 427 tonnes of oil.
Oil and Gas Extraction Department (OGED) named after Haji Zeynalabdin Tagiyev put into operation 11 wells and produced 1,719 tonnes of oil from these wells.
Oil and Gas Extraction Department (OGED) named after A.J. Amirov put into operation 12 wells and these wells produced 1,708 tonnes of oil.
“Absheronneft” Oil Gas Extraction Department put into use 9 wells and these wels produced 2,861 tonnes of oil.
Bibiheybat Oil and Gas Extraction Department carried out capital repairs in 10 wells and 3 of them were put into operation. These wells produced 675 tonnes of oil in September.
Gas Storage Exploitation Unit carried out capital repairs in 4 wells and 2 of them were put into use.
Siyazanneft Oil and Gas Extraction Department put into operation one well and produced 39 tonnes of oil.
Muradkhanli field put into use one well and produced 40 tonnes of oil.