Minister of Transport Ziya Mammadov informed the President on the main indicators of the reconstructed section. To him, the total length of the road is 20 km, 11 km of which is 6-way, 9 km - 4-way.
Reconstruction of Sabunchu-Zabrat part was carried out in 2012, Zabrat-Mashtaga-Buzovna section was renovated in 2012-2013.
Remodeled to meet modern requirements, the road will connect Sabunçu, Zabrat, Mashtaga, Nardaran, Buzovna, Zagulba, Bilgeh settlements and conjoin these settlements with Azadliq Avenue-Airport-Bilgeh highway. It will provide convenient travel to more than 140 thousand people.