Bank Of Baku

Baku-Ceyhan pipeline transported 488,000 tonnes of Turkmen oil last month

Baku-Ceyhan pipeline transported 488,000 tonnes of Turkmen oil last month
# 18 February 2014 12:45 (UTC +04:00)

Baku. Agshin Rafigoglu – APA-Economics. Azerbaijan’s main oil pipelines transported 3.7 mln tonnes of oil in January, 2014.

 

State Statistical Committee says ¾ of transportation was carried out via Baku-Tbilisi-Ceyhan pipeline and 2.9 mln tonnes of oil were transported via this pipeline last month.

 

At the same time, 488,300 tonnes of transit Turkmen oil were transported via BTC pipeline through Sangachal terminal.

 

Main gas pipelines transported 2.3 bcm of gas during the reporting period, up 16.4% by contrast to a year earlier. 27.5% or 0.7 bcm of gas was transported via Baku-Tbilisi-Erzurum. 

 

 

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED