Bank Of Baku

Baku Oil Refinery increases productions by 5%

Baku Oil Refinery increases productions by 5%
# 15 October 2010 12:21 (UTC +04:00)
Baku. Nijat Mustafayev – APA-Economics. Baku Oil Refinery Named After, Heydar Aliyev overfulfilled the forecast by 5.8%, during January-September, 2010.

SOCAR says 4 384.7 thousand tons raw materials were processed while the forecast was 4 144.1 thousand tons. 3 376.2 thousand tons of this was crude oil.

The processing of raw materials made 203.7 thousand tons during 9 months of 2010, up 4.9% compared with a year ago. Gasoline made 1.2$, kerosene And diesel fuel – 7.8%, LNG production – 30.2%.
1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED