Bank Of Baku

Transportation capacity of Baku-Ceyhan pipeline to be increased

Transportation capacity of Baku-Ceyhan pipeline to be increased
# 07 October 2010 10:05 (UTC +04:00)
According to him currenbt daily transportation capacity of BTC is 1.2 mln barrels: “Transportation of Kazakh and Russian oil via this pipeline is attractive for Azerbaijan and SOCAR interests in that pipeline operates in full capacity”.

He also noted that industrial production of oil will begin in 2018-19, capacity of the pipeline can be increased up to 1.6 million bpd and above..

Kaskhagan project is realized via BTC and great oil production is expected within the frame work of this project in 2019.
1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED