Bank Of Baku

Azerbaijani president reviews several roads after reconstruction in Baku

Azerbaijani president reviews several roads after reconstruction in Baku
# 29 December 2015 11:14 (UTC +04:00)

It was noted that the reconstruction works in 5.5 km-road in Khatai district have been carried out in accordance with the high standards, total of 131,000 m² area has been asphalted.

 

Up to 2,000 m² pavement was reconstructed and asphalted. The roads have been supplied with lightening system. All communication lines have been constructed under the ground.  

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED