Bank Of Baku

Construction of the Horadiz-Jabrayil-Zangilan-Aghband road nears completion -PHOTO -VIDEO

Construction of the Horadiz-Jabrayil-Zangilan-Aghband road nears completion -PHOTO  -VIDEO
# 15 April 2025 09:30 (UTC +04:00)

The construction of the Horadiz-Jabrayil-Zangilan-Aghband highway (Zangezur corridor) has been completed to 93%, APA-Economics reports.

The total length of the road is 149.9 km, with the main road measuring 123.6 km. The technical grade of the road is 1B, which ensures high-speed and safe movement. The width of the road varies between 14-21 meters, with the width of the embankment ranging from 21.5 to 29.5 meters. The number of traffic lanes is set between 4 and 6, which facilitates smooth and safe traffic flow.

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED