Azerbaijan builds 4 hydroelectric power stations in Kalbajar -PHOTO

Azerbaijan builds 4 hydroelectric power stations in Kalbajar -PHOTO
# 25 November 2023 10:57 (UTC +04:00)

"AzerEnergy" has reconstructed and put into operation 6 small hydroelectric power stations in Kalbajar district of Azerbaijan so far, APA-Economics reports.

It was noted that the construction of small hydroelectric power stations is currently underway in Kalbajar district by "AzerEnergy" in 4 places. Putting into operation the small hydroelectric power stations named " Aşağı Vəng ", " Yuxarı Vəng", " Nadirxanlı " and "Zar" is planned in 2024.

#
#

THE OPERATION IS BEING PERFORMED