First oil extraction from Karabakh field to take place in 2029

First oil extraction from Karabakh field to take place in 2029
# 03 June 2025 13:21 (UTC +04:00)

The infrastructure to be created in the Karabakh field will be connected to the existing infrastructure in the Azeri-Chirag-Guneshl" (ACG) block, BP's Executive Vice President for Production and Operations Gordon Birrell told journalists, APA-Economics reports.

According to him, the mentioned process will allow the development of the Karabakh field to begin as soon as possible:

"According to the plan, the first oil production from Karabakh will take place in 2029. Most likely, a small platform will be installed on the field, and this platform will be connected to the existing infrastructure of ACG."

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED