Chairman of Azeravtoyol OJSC Saleh Mammadov informed the president about the works carried out.
Construction of the road, which connects 18 residential areas with a total population of 35,800 people, started in 2011. The road is 53km in length and 7 metres in width.
The head of state was also informed of construction of Goylar-Gushchu road in Shamakhi district.
Head of the state cut the ribbon symbolizing the opening of the new road.